What is a Requirement?

Key Definitions :
  • The As-Is system is the current system and may or may not be computerized
  • The To-Be system is the new system that is based on updated requirements
  • The System Proposal is the key deliverable from the Analysis Phase

The goal of the analysis phase is to truly understand the requirements of the new system and develop a system that addresses them -- or decide a new system isn’t needed. The System Proposal is presented to the approval committee via a system walk-through. Systems analysis incorporates initial systems design. Requirements determination is the single most critical step of the entire SDLC.

Requirement is...

  • A statement of what the system must do 
  • A statement of characteristics the system must have
  • Focus is on business user needs during analysis phase
  • Requirements will change over time as project moves from analysis to design to implementation

Requirement Types :
- Functional Requirements
  • A process the system hast to perform
  • Information the system must contain
- Nonfunctional Requirements
  • Behavioral properties the system must have : Operational, Performance, Security, Cultural and political.
Documenting Requirements :
- Requirements definition report
  • Text document listing requirements in outline form
  • Priorities may be included
- Key purpose is to define the project scope: what is and is not to be included.

Basic Steps of Determining Requirements :
- Understand the “As-Is” system
- Identify improvement opportunities
- Develop the “To-Be” system concept
- Techniques vary in amount of change
  • Business Process Automation (BPA) – small change
  • Business Process Improvement (BPI) - moderate change 
  • Business Process Reengineering (BPR) – significant change
- Additional information gathering techniques are needed as well

Project Management

Project management is the process of planning and controlling the development of a system within a specified timeframe at a minimum cost with the right functionality. A project manager has the primary responsibility for managing the hundreds of tasks and roles that need to be carefully coordinated.
Four Key Steps in Managing Projects :
  • Identifying project size
  • Creating and managing the workplan
  • Staffing the project
  • Coordinating and controlling project activities
Identifying Project Size
Project Manager’s Balancing Act - Project Management involves making trade-offs…

Modifying one element requires adjusting the others.

Project Estimation
  • The process of assigning projected values for time and effort
  • Sources of estimates (Methodology in use, Actual previous projects, Experienced developers)
  • Estimates begin as a range and become more specific as the project progresses
Creating The Workplan
Identifying Tasks :
  • Methodology (Using standard list of tasks)
  • Top-down approach (Identify highest level tasks, Break them into increasingly smaller units, Organize into work breakdown structure)
List of all tasks in the work breakdown structure, plus :
  • Duration of task
  • Current task status
  • Task dependencies
  • Key milestone dates
Tracking Project Tasks :
  • Gantt Chart (Bar chart format, Useful to monitor project status at any point in time)
  • PERT Chart (Flowchart format, Illustrate task dependencies and critical path)
example :
  • Tracking Tasks Using Gantt Chart


  • Tracking Tasks Using PERT Chart



Staffing The Project
Staffing Attributes
  • Staffing levels will change over a project’s lifetime
  • Adding staff may add more overhead than additional labor
  • Using teams of 8-10 reporting in a hierarchical structure can reduce complexity
Controlling Project Activities
CASE Tools :
CASE Components :


Standards Examples :
  • Formal rules for naming files
  • Forms indicating goals reached
  • Programming guidelines
Documentation :
  • Project binder
  • Table of contents
  • Continual updating
Managing Risk :
  • Risk assessment
  • Actions to reduce risk
  • Revised assessment
Classic Mistakes :

  • Overly optimistic schedule
  • Failing to monitor schedule
  • Failing to update schedule
  • Adding people to a late project